GE HEALTHCARE

Watford General Hospital

Project Description:

Programme Length:

Project Value:

New CT Department

11 Weeks

£454,000.00

Overview

This project was a Design & Build conversion of an existing storage area into a new Cardiac CT Department.

The works included the following:

  • Full Architectural design service.
  • The removal of non-load bearing walls along with a variety of fixtures and fittings.
  • The remodelling and alteration of an existing space to create a new Exam Room, Control Room and Waiting Area.            
  • The undertaking of out of hours work within close proximity of an A&E Department to form a new Waiting Area c/w bespoke automated sliding doors with vision panels.
  • Structural design works to facilitate the installation of lead protection in accordance with RPA recommendations.
  • Radiation protection works inclusive of lead lining to walls; new RP rated doors and viewing window.
  • All new finishes to meet end user requirements.
  • Full new Electrical installation including new equipment supply cable; equipment specific wiring; lighting scheme; door access system; mechanical plant supplies; IPS & UPS.
  • Full new Mechanical installation to include stand-alone ventilation, domestic services; heating and cooling.