SIEMENS HEALTHINEERS
Kings College Hospital
Project Description:
Programme Length:
Project Value:
Nuclear Medicine
12 Weeks
£290,000.00
This project was to redevelop an existing CT and bed prep area within a live hospital. This consisted of the enlargement of the existing Exam Room, incorporating new RPA lead works , new Lead doors with integral warning lights to enable the installation of a new Siemens Spec CT. We also created a new Control Room and Argus Room to improve the new Nuclear Medicine Department.
The construction works included the following:-
- Strip out of all areas to be redeveloped
- Lead lining as instructed by the RPA
- Construction of partition walls to form new layout
- Joinery works
- M&E modifications and upgrades
- Internal finishes
- Fitted furniture