UNIVERSITY HOSPITALS BIRMINGHAM
Good Hope Hospital
Programme Length:
Project Value:
Project Description:
9 Weeks
£490,000.00
Cedarwood Ward Refurbishment
This project entailed the complete refurbishment of an existing ward to create a new 25-bedroom rehabilitation ward including bedrooms, WC’s, wet-rooms, dining & lounge areas, kitchens and stores.
Works were completed over an extremely challenging 9-week period including out of hours and weekend working to ensure critical go live dates were achieved.
The construction works carried out included the following:
Strip out, demolition and internal reconfigurations
Drainage alterations
Floor, wall and ceiling finishes
Fit out kitchen areas
Internal door replacement
Sanitary ware and IPS replacements
Wall protection
Fixture and fittings
![IMG_1233](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1233-570x450.jpg)
![IMG_1276](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1276-570x450.jpg)
![IMG_1266](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1266-570x450.jpg)
![IMG_1170](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1170-570x450.jpg)
![IMG_1114](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1114-570x450.jpg)
![IMG_0963](https://mogroup.uk/wp-content/uploads/2019/10/IMG_0963-570x450.jpg)
![IMG_1024](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1024-570x450.jpg)
![IMG_1050](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1050-570x450.jpg)
![IMG_1048](https://mogroup.uk/wp-content/uploads/2019/10/IMG_1048-570x450.jpg)