Project Description:

Programme Length:

Project Value:

3 Nr MRI Scanners

35 Weeks

£1,700,000.00

This scheme was secured under a negotiated open book & consisted of the total redevelopment of an existing MRI suite, with an additional area added so that a 3rd MRI could be installed. The project was phased with the need to deliver and get the 3rd MRI installed and operational before the existing 2 could be removed. The Logistics had to be carefully considered to minimise disruption to the surrounding departments.

The construction works included the following:-

  • Strip out of all areas to be redeveloped
  • Steel shielding & RF Cabin works
  • Construction of partition walls to form new layout
  • Joinery works
  • Extensive M&E works
  • Internal finishes
  • Fitted furniture
  • External plant deck
  • Underground drainage works