SERCO LTD

Bolton

Programme Length:

Project Value:

Project Description:

26 Weeks

£365,000.00

Call Centre Refurbishment

This project was a pre-designed competitive tender scheme which included the full refurbishment of a 4500m² call centre. All works were carried out during night shifts so that the Call centre could remain operational during the day

The construction works carried out included the following:

  • Replacement of ceiling tiles

  • Decorations throughout

  • Installation of new kitchens

  • New carpet tiles and vinyl flooring

  • General M&E works