INHEALTH LTD

Romford

Programme Length:

Project Value:

Project Description:

16 Weeks

£1,500,000.00

Endoscopy Clinic

This project involved the forming of a new Clinic within the shell of an existing building, spread over two floors. The project was a full design and build from concept to completion on a negotiation basis and subsequently value-engineered to meet the clients budget

The construction works included the following –

  • New ceilings and partitions to create new layout

  • Floor wall and ceiling finishes

  • Glazed Partitions

  • WC and kitchen areas

  • M&E Installations inclusive of roof top plant

  • IPS Units

  • Fixtures and Fittings