SIEMENS HEALTHCARE

Swansea Institute of Life Sciences

Programme Length:

Project Value:

Project Description:

13 Weeks

£405,000.00

MRI Suite

This project was for the creation of a new MRI Suite within an existing building

The construction works included the following:-

 

  • Removal of redundant fixtures and fittings

  • Existing walls removed

  • Structural steel works to support the equipment loads

  • New stud walls & doorways erected to form new layout

  • Lead works as instructed by the RPA officer.

  • Internal finishes

  • M&E works