PHILIPS HEALTHCARE

Basildon Hospital

Programme Length:

Project Value:

Project Description:

10 Weeks

£220,000.00

Remodeling & Refurb

This project was a D&B turnkey scheme and the works included the remodeling and the refurbishment of an existing Theatre in preparation for a Philips Allura Xper FD20 Flexmove. The works were carried out over a 10 week period.

The construction works included the following –

  • Removal of redundant fixtures and fittings

  • Existing walls removed

  • Structural steel works to support the equipment loads

  • New stud walls & doorways erected to form new layout

  • Lead works as instructed by the RPA officer.

  • Internal finishes

  • M&E works